Grid connection management

Getting connected is now the longest step in most New Zealand projects. We manage it from the owner's side.

We prepare and lodge your connection applications, coordinate the studies the lines company or Transpower requires, and keep the programme moving through to final approval.

We also design the owner's side of the connection: the substation, cabling and metering arrangements on your side of the point of connection.

Who it's for: Solar, wind and battery developers, independent power producers and large energy users connecting new generation.

What we do

  • Early capacity screening of grid nodes, upgrades and congestion before you commit to a site
  • Initial and final connection applications
  • Liaison with the network operator and its approved consultants
  • Owner-side electrical design and connection works specification